---
id: int.domain_requirement_carries_a_stated_ramp_time
type: intervention
title: "Domain requirement carries a stated ramp time"
lang: en
registry: 1.1.0
canonical: https://hoba.work/interventions/int.domain_requirement_carries_a_stated_ramp_time
json: https://hoba.work/api/v1/interventions/int.domain_requirement_carries_a_stated_ramp_time.json
---

# Domain requirement carries a stated ramp time

A requisition that asks for experience in one named vertical must state how long the team believes that domain takes to learn; where the answer is weeks, the requirement is scored as a preference rather than a gate.

## At a glance

- Actor: hiring manager
- Scope: team
- Cost: low
- Evidence: supported

## What it looks like

Composite excerpts, written to be typical rather than copied. No particular message, company or person is quoted here.

**The field the requisition gains** — *reconstruction*

```
> req  Domain: payments. Ramp estimate entered by hiring manager: 6 weeks to first independent change.
  req  Ramp ≤ 12 weeks → scored as preference. Screening may not reject on domain alone.
  req  To make it a gate, name the regulation, certification or customer commitment that cannot wait 6 weeks.
```

*What to notice* The manager is not asked to drop the preference — they are asked to price it. A vertical that takes six weeks to learn cannot also be the thing that disqualifies someone with ten years of the underlying systems work, and writing the estimate is what makes the two claims meet.

## From each side

The same entry from inside each position that meets it: what reaches them, what it means from there, and what happens next given what they control.

### Hiring manager

- **What reaches them:** A required field asking how long the domain takes, next to the requirement that names it.
- **What it means from there:** The estimate is one the team already makes when it onboards internal transfers; writing it down is what stops the same domain being treated as unlearnable for outsiders.
- **What happens next:** Enters the estimate, and either justifies the gate or accepts candidates who clear everything except the vertical.

### Recruiter

- **What reaches them:** A screening rule that says which requirements may reject and which may only rank.
- **What it means from there:** The instruction that used to arrive as "must have fintech" now arrives with a duration attached, and a duration can be argued with where a preference could not.
- **What happens next:** Advances candidates strong on transferable depth where the ramp is short, and cites the estimate when the manager objects.

### Candidate

- **What reaches them:** A posting that says how long the team thinks its domain takes to pick up.
- **What it means from there:** Whether the vertical is a wall or a ramp is now the employer's stated position rather than something to guess at from a rejection.
- **What happens next:** Applies to the roles where the ramp is stated and short, and stops rewriting a CV to fake a vertical.

## Expected effects

- mech.domain_specificity_over_weighting must state its own cost before it can reject
- A requirement assembled from something other than the work becomes visible at the point it is written

## What to measure

- `ramp_estimate_completion_rate`
- `domain_only_rejection_rate`

## Related entries

- targets — [mech.domain_specificity_over_weighting](https://hoba.work/mechanisms/mech.domain_specificity_over_weighting) — Domain Specificity Over-Weighting
- targets — [bar.recruiter_screening_call](https://hoba.work/barriers/bar.recruiter_screening_call) — Recruiter Screening Call
- targets — [bar.hiring_manager_in_depth_review](https://hoba.work/barriers/bar.hiring_manager_in_depth_review) — Hiring Manager In-Depth Review

---

hoba — a public, versioned atlas of hiring obstacles. Content CC BY-SA 4.0. This document is generated from the registry; the canonical page is linked above.
